What Construction Documents Are Needed? How to Organise and Manage Project Documents So They Are Easy to Find and Never Get Lost

Construction Management

What Construction Documents Are Needed? How to Organise and Manage Project Documents So They Are Easy to Find and Never Get Lost

How to Organise and Manage Project Documents

A construction project produces a lot of documents between the first planning meeting and final handover: drawings, contracts, material lists, schedules, site reports, inspection records and more.

The volume is only part of the problem. The bigger issue on many projects is where those documents end up and how hard they are to find again.

Files get shared through whatever channel is handy at the time. Some sit in email, others in LINE, WhatsApp or Slack, and more are saved on individual team members' laptops. Tracking down one specific file can take far longer than it should.

The pile keeps growing as the project goes on. Without a clear process from the start, something as basic as finding the current drawing revision can start to hold up work on site.

This article covers the main types of construction documents, what each one is for, and how to organise them so your team can find and use them throughout the project.

What construction documents are needed?

Construction documents go well beyond drawings and contracts. They cover planning, design, procurement, site work, inspection and handover.

The exact set depends on the project, but most documents fall into the categories below.

Design and drawing documents

These are the references the work is built from. They may include:

  • Architectural drawings

  • Structural drawings

  • Electrical drawings

  • Plumbing drawings

  • Other MEP or systems drawings

  • Shop drawings

  • As-built drawings

  • Material specifications

  • Drawing revisions issued during the project

Version control matters most here, because the same drawing can go through several revisions. If a site team builds from an old version, the result is errors and rework.

Contracts and scope of work documents

These set out what was agreed between the client, the contractors and any other parties. They may include:

  • Construction contracts

  • Scope of work

  • Work specifications

  • Payment terms

  • Contract appendices

When there's a dispute over who is responsible for a particular task, these are usually the first documents people check.

Material and procurement documents

Materials have to be checked for type, quantity, specification and compliance with standards. The paperwork may include:

  • Material submittals

  • Quotations

  • Purchase orders

  • Delivery notes

  • Material certificates

If these are filed properly, it's much easier to confirm where a material came from and whether it was approved before it was used.

Site documents

Site documents are produced during construction and record what actually happened, as opposed to what was planned. Examples include:

  • Daily reports

  • Site reports

  • Progress reports

  • Site photos

  • Inspection forms

  • Issue reports

They show the real state of the project on any given day, which the original plan can't tell you.

Quality inspection and control documents

Work is checked for quality at several stages. The related documents may include:

  • Inspection requests

  • Checklists

  • Test reports

  • Non-conformance reports

  • Records of corrective work

If the quality of a piece of work is questioned later, these records show what was inspected, when, and what the outcome was.

Safety documents

Projects also need documents covering health and safety on site, such as:

  • Safety plans

  • Risk assessments

  • Toolbox talk records

  • Permits to work

  • Accident reports

  • Incident reports

Keep these with the rest of the project information. They may be requested during inspections, and they often need to be read alongside site records for the same day or activity.

Handover documents

The number of handover documents rises as the project nears completion. They may include:

  • As-built drawings

  • Operation and maintenance manuals

  • Warranties

  • Acceptance certificates

  • Other certificates and supporting documents

Collect these as you go rather than leaving them until the end. Otherwise someone has to dig back through months of files to find them, which is slow and makes it easy to miss something.

Common problems when documents are stored in several places

Separate folders and personal laptops can work on a small project. Once the document count grows and more teams get involved, finding, checking and controlling information gets harder. These are the problems that come up most often.

Documents are hard to find

When files are spread across lots of folders, finding a specific one takes time. Inconsistent file names and categories make it worse.

Nobody is sure which version is current

Documents revised several times leave behind a trail of files with similar names. Teams get confused, and the chance of someone using an out-of-date version goes up.

Information is split across channels

Some documents are on laptops, some in email, some in LINE, some in cloud storage. People end up checking several places just to find what they need for the job in front of them.

Updates don't reach everyone

If a drawing is revised but the new version isn't sent to everyone who needs it, some teams carry on working from the old one.

Revision history is hard to follow

Ordinary file storage doesn't always show who changed a document, when, or what they changed. That makes it difficult to trace decisions after the fact.

Coordination takes longer

Without one central place for documents, people keep having to ask colleagues for files or information. Each request adds a small delay, and they add up.

Construction document management systems

A construction document management system stores, organises, searches and controls project documents in one central place.

Instead of information being spread across folders, personal files and channels like email, LINE, WhatsApp, Slack and cloud storage, everything sits in the same system. That can include:

  • Construction drawings

  • Contracts

  • Material information

  • Quotations

  • Site reports

  • Photos

  • Inspection records

  • Handover documents

As well as storing files, these systems usually let you:

  • Control document versions

  • Set access permissions

  • Track revisions

  • Search across all project information

Everyone involved can get to the documents they need, and there's less chance of anyone working from the wrong version. The benefit is greatest on projects with several teams or contractors, or with large numbers of documents that change throughout the job.

Because contractor paperwork lives in the same place, a document management system also makes contractor management easier to keep on top of.

KANNA: construction document management you can reach from anywhere

KANNA is a project management platform that supports both contractor management and construction document management by keeping project information organised and connected.

Work, documents and related information sit in one place, so teams don't have to keep switching between separate files and messaging apps.

Documents can be attached to the project or task they relate to, including:

  • Construction drawings

  • Reports

  • Photos

  • Other supporting documents

When someone needs a file, they search for it in KANNA instead of opening folder after folder or scrolling back through old chats. Less time goes on looking for documents, and everyone works from the same information.

KANNA also helps office and site teams share information. Users can view or update project information according to the permissions they've been given, so updates from site reach the people who need them, and different teams are less likely to end up with different versions of the same document.

Beyond storage, KANNA links together:

  • Projects

  • Tasks

  • The people responsible for them

  • Site information

  • Supporting documents

Project managers can then see the work and its documents in one view and use that information for planning and running the project.

Frequently asked questions

What types of construction documents are commonly used?
Common types include construction drawings, contracts and scope of work documents, material and procurement documents, site reports, quality inspection records, safety documents and handover documents. The exact set depends on the project.

Why is version control important in construction?
Some documents, drawings in particular, are revised during the project. Without version control, site teams can end up using an outdated version, which leads to incorrect work and rework.

What size of project needs a construction document management system?
Projects of any size can use one, but the benefits are most obvious when there are lots of documents, several teams, or many people who need access to the same information.

What problems does a construction document management system solve?
It keeps documents organised, makes information easier to find and access, supports version control, and stops documents being scattered across email, chat apps and personal computers.

What features should construction document management software have?
Look for document storage and search, categorisation, version control and access permissions. Ideally it should also let you link documents directly to projects or tasks, so they form part of how the team actually works rather than sitting in a separate archive.